Tuesday, 26 February 2008

Lights on but no one home JUST YET

The electricity got connect last weekend and the electrician turned up this evening to safely stick in a few bulbs and check how we'd look with the lights on.
Here is a photo in the dark of the house with lights on.


Painter got going with his spray gun aswell over the w/end and it looks like Mr Bean was in and blew up a few cans.. everywhere white. Looks great and it'll be staying like that for a while.

Heating now by end of week is the goal, then we can patch up the floors and let the tiler move in.

Digger has covered in all the trenches for the services and is due back Easter week to dig out for the percolation/sewerage/drains/soakways. Off to read the Builders Manual Section H on this topic!

Friday, 15 February 2008

Time Flying by

Been over a month since last update.. what's happened. 2nd fix of electrics and plumbing.. so radiators are hanging, water tank is in place, oil boiler in garage fixed in, now awaiting the ESB connection. Fantastic weather since early Feb when the digger arrived, we've lots of open trenches now, for water up to house, electric connection to pole on sunroom side of house, pipes from garage to house and house to garage. its an interesting maze.

Here is a photo of the internals of the hotpress.... soon i'll need to know what every knob, temperate gauge and gadget is!


The trench out the back of the house -> insulated pipes for the heating coming in, and another one to appear next week for the solar heat into the house.


Once power is in, we;ll get heating going and seal up all the radiator pipes then we can start with the tiling downstairs and in the ensuites!

Friday, 4 January 2008

Snow on Site - Jan 4th

Snow, snow, snow. well for 1 hour in Limerick. Just enough time to capture the look on the house!


Electrician due on 14th Jan, so hopefully ESB will be connected by end of the month.
Inside plastering nearly there. Sunroom and hallway to be finished off.
Coving being down in hall and 2 front rooms then get the painters in to go mad.. do a Mr. Bean and blow up the pots of paint.. quickest way to paint a room!

Outside - digging needs to start. ESB connection first then start the drains and percolation! plenty of fun, hopefully weather stays somewhat dry to keep the mud levels low.

Friday, 7 December 2007

Stonework finished - last windows in

Its taken a bit longer but all in good time, the stonework has been completed at the garage, front door and around the sunroom.
Garage

Sunroom


Front Door.


Last windows in now aswell. Sunroom, front door and front window and the stain glass window (designed by myself.)

Designed window.


So finally the house is sealed up, next tasks were to get the scaffolding down. done by Dec 1st. New year tasks now to get the digger in for all the drains and heating pipes to garage, get a condensed oil boiler and the key ingredient - ELECTRICITY, sorted, so we can warm up the house and get going on the next steps.

Electrician back first, then plumber, tiler to be sorted. might try some painting over the xmas holidays. furniture buying.

INTERIORS progress.
Stairs - awaiting final drawings and prices. Kitchen booked for end Jan - start Feb. My bed bought ( 1st one a bit too long so new one sorted now). Dining table and chairs ordered. Tiles picked for downstairs(hall, sunroom, kitchen and utility). Over xmas wooden floors for sitting and tv rooms to be sorted, with the stairs carpet, and onto landing. Plenty of furniture spotted, so awaiting the lotto numbers to be able to pay for it all :o)))

Latest House photo

Friday, 9 November 2007

Steel & Stone week - up to Nov 2nd & Nov 9th

Stonework around sunroom going well, awaiting sills which finally will be delivered on 2nd Nov - and off up again they can go after that.

Steel for over windows arrived (minus 2 lintels) so trying to locate them now. Garage work can continue so that should be finished by early next week. Finished on Nov 3rd. Scaffolding still up in front of it so photo to arrive later!

1 beam over front door needs to be inserted into the side walls so core-drilling dude required for that. and get him to core out vents in kitchen and utility while he's there! Core work done on 2nd Nov, steel through front door holes on the following Tues. 6 men to do that. Now stone continuing up the wall. Sunroom sills put in just this week, and stone going up around them. Still locating the 2 final steel lintels (special screw fixing required to attach it to the corner of wall (nothing to support it from ground up - all fun)

Slabber nearly finished inside - besides the 2 open window areas and the sunroom. Some small bits to be done still this week Nov9th, hard to get him to just finish it off! Hope to get plasterer back to start skimming next Monday 12th Nov.

Wednesday, 24 October 2007

Slabber and stonemason started - to Oct 24th

Last week the slabbing started with all the ceilings on the ground floor completed and now the walls have started. Upstairs all the stud walls got 1 sided slabs, so then i had the job of packing in the rockwool over the weekend. This week is completing the other side of stud walls and onto the attic. Rooms are now feeling like real rooms as you can't see from room to room anymore. Smaller in some ways but now i know the layouts etc.

Stonemason started yesterday 23rd Oct. Here is a photo of their work so far.
Garage front gable ->


Steel on order to be put in over all window and door openings to support the stone over that! Window sills on order (was going to precast and make them but that effort will take too long and outcome is unknown). so back to the shop made. hopefully they'll arrive by early next week and we'll rock on with getting stone up and windows in. Then finally the house will be sealed up!

Slabber has then to return to do the sunroom and around the windows/front door that are not in yet.

Heating and electricity are the next jobs and then onto tiling aswell.

Monday, 15 October 2007

up to Oct 15th

Finally 2 buckets of colour render arrived on on 10th October so plasterer could do the back wall of house, then up on the scaffolding again to paint the sills.

Inside the electricians got all 1st fix done by Friday evening.

Insulating guys came on Sat morning, did about a 1/4 of the attic with kingspan, and didn't come back til today Monday. pressure on them now as the slabbing team arrived to meet the delivery of plasterboards so they are going to start on ground floor today and once insulation in roof and between joists they'll start upstairs.

Stonemason due on later this week, so steel order in for over the windows/doors of sunroom and front door and garage.

busy week, no new pictures.