Tuesday, 26 June 2007

New Photos

Finally got a sunny day to try take some photos of the latest activities on site. This is a view from inside the gate.




Window sills are on the way. Garage really taking shape. Acquired a free window from the folks for the garage so i'm saving a bit of dosh!! Window to be placed on near wall of photo.


Security on site so far has not been an issue but with the birth of new calf, i think i'll have the place supervised for free over the next few months ->







Interesting times with the measuring up of the pre-cast floor, head height on the stairs etc. Engineer and company working to find the right solution -> getting a "cantilevered slab" to allow for a steep rise on first part of stairs and then extend the landing back towards the gable for the last 3 steps after the half landing! Photo to follow once pre-cast appears on site.

My reclaimed Limestone (from Dromineer) has arrived from Nenagh, first load is the loose stone for the front gate entrance, that stone will stay put for a while.
Bagged stone to come over w/end for the sunroom, front door and front of garage.